Skip to content
Design your pod in 3D
Solo1 personSolo Plus1 personDuo2 peopleTeam2 peopleMeetUp to 4 peopleMaxUp to 6 people BespokeCustom sizes & layouts
Compare all models Made to order. Made yours.
Plan a quote

A real team. A considered project.

Live chat Send a project enquiry ↗Indonesia · IDR

FocusPod / Indonesia

Prepare your workplace for installation

Prepare the final position and the route into it before the pod arrives. Coordinate the model, furniture layout, assembly area and electrical version with the responsible facilities team and the agreed installation scope.

01

Check the workplace layout

Place the finished pod and its selected furniture on the floor plan. Allow for door movement, circulation, ventilation and the required assembly clearance. Have the site team assess floor suitability and any building, fire or accessibility requirements.

How your pod arrives

See how your pod arrives in sections and is assembled at your workplace.

Watch video11 seconds

How your pod arrives

Captions includedOpen video
02

Agree the installation responsibilities

Keep unloading, movement to the floor, assembly, final positioning and packaging removal separate in the scope. Identify travel, tools or special handling that the particular destination needs. Confirm the building’s work window and contractor process before scheduling.

03

Prepare power and handover

Confirm the supplied electrical version, connection requirements and selected powered options before ordering. At handover, compare the delivered model, furniture and extras with the agreed configuration and check the door, lighting, ventilation and power with the responsible team.

Fire safety & building requirements

Sprinkler and fire-alarm options are available. We help you confirm the details for your pod and workplace.

Can you include sprinklers and fire alarms?

Yes. Choose the optional sprinkler and fire-alarm combo in the configurator. It is priced per pod and included in your configuration total when selected. Your building manager may request it as part of approving the pod for your space; the equipment, building-system connections and installation scope are confirmed for your site.

Discuss your building requirements

What should I know about fire ratings?

Fire information is specific to the model and materials. A material fire classification does not establish a fire-resistance rating for the complete pod. Ask us to confirm the relevant test documentation for your chosen model and finishes.

An acoustic “Class A” rating describes sound reduction, not fire performance.

Ask about fire-rating documents

What should we check before ordering?

Start with your building manager: they may have requirements for introducing a pod into your workplace. Share those requirements and your installation address with us so we can confirm the appropriate equipment and connections with your building team. Local fire requirements still apply; the package is not a blanket requirement for every pod.

A space of your own

Let's make it yours.

Choose the pod. Shape the details.
We bring your approved configuration together.

Design your pod Talk about your project Explore in 3D. No payment to begin.