FocusPod / Indonesia
Check the dimensions that matter
Check the working space and the delivery route separately. Use the finished dimensions for your floor plan and the package schedule for the goods lift, corridors and receiving area.
Read the three sets of dimensions
External dimensions describe the pod’s footprint. Internal dimensions describe the space available to the selected furniture and users. Door passage dimensions describe the opening into the finished pod. Allow the required assembly, ventilation and door clearances in addition.
Base crates and additional packages
The listed base-pod crates do not include every possible furniture or cooling package. Net pod weight is different from packed shipping weight. Review the complete package schedule for your chosen options and quantity before a freight booking.
Coordinate the electrical specification
Include the required outlets, power modules and compatible powered options in the configuration. Confirm the electrical version and any building requirements with the final specification before ordering.
| Model | People | Exterior W × D × H | Interior W × D × H | Net kg |
|---|---|---|---|---|
| Solo | 1 | 1080 × 1000 × 2338 mm | 942 × 960 × 2146 mm | 290 |
| Solo Plus | 1 | 1600 × 1375 × 2338 mm | 1462 × 1335 × 2146 mm | 442 |
| Duo | 2 | 1600 × 1375 × 2338 mm | 1462 × 1335 × 2146 mm | 442 |
| Team | 2 | 2300 × 966 × 2338 mm | 2162 × 926 × 2146 mm | 504 |
| Meet | Up to 4 | 2300 × 1785 × 2338 mm | 2162 × 1745 × 2146 mm | 635 |
| Max | Up to 6 | 2600 × 2605 × 2338 mm | 2462 × 2565 × 2146 mm | 852 |
Capacity depends on furniture. Measurements exclude required assembly, ventilation and servicing clearances. Net weight is not packed shipping weight. See each model for door passage, packaging and full specifications.
Fire safety & building requirements
Sprinkler and fire-alarm options are available. We help you confirm the details for your pod and workplace.
Can you include sprinklers and fire alarms?
Yes. Choose the optional sprinkler and fire-alarm combo in the configurator. It is priced per pod and included in your configuration total when selected. Your building manager may request it as part of approving the pod for your space; the equipment, building-system connections and installation scope are confirmed for your site.
What should I know about fire ratings?
Fire information is specific to the model and materials. A material fire classification does not establish a fire-resistance rating for the complete pod. Ask us to confirm the relevant test documentation for your chosen model and finishes.
An acoustic “Class A” rating describes sound reduction, not fire performance.
What should we check before ordering?
Start with your building manager: they may have requirements for introducing a pod into your workplace. Share those requirements and your installation address with us so we can confirm the appropriate equipment and connections with your building team. Local fire requirements still apply; the package is not a blanket requirement for every pod.
A space of your own
Let's make it yours.
Choose the pod. Shape the details.
We bring your approved configuration together.